The Ministry of Transport and Sustainable Mobility has awarded Grupo RUBAU the project for the improvement of the N502a as it passes through Talavera de la Reina (Toledo) to adapt it for pedestrian and cyclist traffic. The works focus on improving 4.56 km of urban road, and the tasks include resurfacing and generally conditioning these […]
The Ens d’Abastament d’Aigua Ter-Llobregat (ATL) has awarded a 102 million euro contract for the rehabilitation works of the Ter plant project (ETAP Ter) to the consortium UTE RUBAU – AREMA – FERROVIAL – CADAGUA. The actions include the rehabilitation of the existing sand filters, the construction of a new reservoir and a pumping station, […]
This is an exclusive development with an A energy rating, featuring a swimming pool, children’s play areas, and pre-installation for electric vehicle charging. RUBAU will build the Residencial Inbisa Castellar, a residential complex of 135 homes, garages, and storage rooms in Castellar del Vallés. The development, located on Ronda Tolosa in this Vallés town, includes […]
The Ministry of Transport and Sustainable Mobility has awarded the RUBAU – TECOPSA joint venture the contract for implementing corrective measures regarding noise pollution in sections B and C of the Northwest Arc Highway in Murcia. These are complementary actions involving an investment of over €2.8M to reduce noise pollution in these sections, which cover […]
The Home Affairs Department of Generalitat of Catalonia has awarded the contract for the project and construction of a temporary modular prefabricated building to the joint venture RUBAU-MEPAL. This building will house the Basic Police Area (ABP) of the Mossos d’Esquadra in the Sant Martí district of Barcelona. The project, with a budget exceeding €2.2 […]
The Catalan Water Agency (ACA) has awarded the remodeling works of the Sant Gregori wastewater treatment plant (Girona) to the joint venture AREMA-RUBAU to adapt it to current and future sanitation needs. The contract, with an amount exceeding 6.5 million euros, includes the commissioning of the facility for 3 months and the operation and maintenance […]
After just over two years since being established by Rubau and Sorigué, NEOVIA, with two significant road maintenance contracts, has already managed to establish itself as a leading company specialized in asphalt services. Currently, Neovia is carrying out maintenance and strengthening works on 99 roads in the North of Girona. In total, 150,000 m2 of […]
RUBAU, in a joint venture with Romero Polo, has been awarded the reurbanization works of La Rambla in the stretch from Santa Madrona to the Liceu, in the Ciutat Vella district. The intervention, with a planned duration of 32 months, aims to enhance and reclaim La Rambla as a civic space. The transformation of the […]