The Ministry of Transport and Sustainable Mobility has awarded the RUBAU – TECOPSA joint venture the contract for implementing corrective measures regarding noise pollution in sections B and C of the Northwest Arc Highway in Murcia.
These are complementary actions involving an investment of over €2.8M to reduce noise pollution in these sections, which cover kilometers 4.3 to 21.7 and are currently under construction. This highway will connect the A-30 with the MU-30 bypass ring at the Alcantarilla junction. The project includes the installation of twenty noise barriers of the necessary length and height to comply with the regulations established by authorized control bodies.
The project will be financed through the Recovery, Transformation, and Resilience Plan (PRTR) with funds from NextGenerationEU to carry out sustainability, energy efficiency, and noise action measures on the road network.
The Director of Environmental Policies and Natural Environment of the Generalitat, Marc Vilahur, and the Director of L’Energètica, Daniel Pérez, visited the Prenergy (Grupo RUBAU) photovoltaic park in Vidreres on November 26. Both public representatives reiterated the Catalan administration’s strong interest in this solar park, promoted by Prenergy (Grupo RUBAU), which is set to become […]
Infraestructures de Catalunya has awarded RUBAU Constructions the works for the reinforcement of the underground gallery on the C-66 road between Girona and Celrà to proceed with its complete reinforcement and rehabilitation, thereby preventing collapse at any point along the route, which has been experiencing partial subsidence resolved with punctual actions. The execution of the […]
L’Energètica, the public company of the Generalitat of Catalonia for the production and supply of renewable energy, has pre-selected for acquisition, at a cost of 2.9 million euros, the solar park that Prenergy (Grupo Rubau) has built in Vidreres. The solar park promoted by Prenergy in Vidreres has a peak capacity of 3.4 MWp, which […]
An exclusive residential complex that combines innovation, energy savings, and communal facilities, offering the opportunity to enjoy leisure and sports in a peaceful yet urban environment. RUBAU has completed the construction of a residential complex consisting of 96 homes for Vía Célere in the town of Dos Hermanas, Seville. The development offers 96 homes with […]