The Tierra Bomba Consortium, of which Colombiana de Proyectos de Infraestructuras S.A.S. (a RUBAU GROUP company) is a member, has been awarded the contract to undertake coastal protection works at Bocachica and Caño del Oro, in the department of Bolívar. The Colombian Government, through the National Roads Institute (Invías), awarded the contract, worth more than 10 million euros, in December.
This project will advance longitudinal coastal protection with riprap by around 800 metres in each of the towns and sectors of beach will be regenerated in certain areas where they had disappeared. In addition, town planning works will be carried out, such as promenades and piers for boats (7 piers in Bocachica and 4 in Caño del Oro).
The waterfronts at Bocachica and Caño del Oro are currently battered by waves. Through these works RUBAU will fulfil the undertaking given by the Colombian Government to these two towns, mitigating the effects of this phenomenon on the coastline and preventing direct impact by dissipating energy before it reaches the shore.
Infraestructures de Catalunya has awarded RUBAU Constructions the works for the reinforcement of the underground gallery on the C-66 road between Girona and Celrà to proceed with its complete reinforcement and rehabilitation, thereby preventing collapse at any point along the route, which has been experiencing partial subsidence resolved with punctual actions. The execution of the […]
L’Energètica, the public company of the Generalitat of Catalonia for the production and supply of renewable energy, has pre-selected for acquisition, at a cost of 2.9 million euros, the solar park that Prenergy (Grupo Rubau) has built in Vidreres. The solar park promoted by Prenergy in Vidreres has a peak capacity of 3.4 MWp, which […]
An exclusive residential complex that combines innovation, energy savings, and communal facilities, offering the opportunity to enjoy leisure and sports in a peaceful yet urban environment. RUBAU has completed the construction of a residential complex consisting of 96 homes for Vía Célere in the town of Dos Hermanas, Seville. The development offers 96 homes with […]
ADIF has entrusted RUBAU with the renovation works of the Bordils-Juià station in the province of Girona, with a budget of 4.5 million euros and a completion period of 15 months. The work consists of constructing an underpass to connect the platforms, replacing the current level crossing of the tracks, which is currently the only […]